Swimming pools
Swimming pool design & construction
We deliver the complete pool: survey, structure, waterproofing, pipework and plant room, then mosaic, lighting, commissioning and handover, with one team and one point of responsibility.
- Construction
- Systems & equipment
- Finishing
- Testing & handover
Introduction
Swimming Pools
A pool is an engineered structure before it is a design feature. Water quality, quiet operation and the life of the finish are all decided during construction: accurate levels, correct reinforcement, sound waterproofing, and the position of every return and suction fitting.
That is why we run every pool in two clear phases: construction, which builds a watertight, fully serviced concrete shell, and finishing, which turns that shell into a refined space that runs every day without trouble.
What WORLD POOL provides
- Outdoor pools for villas, palaces and rest houses
- Indoor pools with dehumidification
- Competition and semi-Olympic pools with lanes
- Leisure pools with hydromassage loungers and seats
- Infinity and overflow-edge pools
- Renovation of existing pools
Technical scope
What the work covers
01Design & drawings
Structural, hydraulic and electrical drawings defining basin geometry, depths, returns, suctions and lighting before work starts on site.
02Structural works
Excavation, compaction and blinding, then slab and wall reinforcement, formwork, and reinforced-concrete casting of the basin, steps and built-in benches.
03Waterproofing
Membrane systems for walls, floor and penetrations, followed by a fill test of the basin before any finishing begins.
04Hydraulic systems
Return inlets, main drains, skimmers or overflow channels, and buried pipework sized for even circulation.
05Filtration
Sand filters and circulation pumps selected for pool volume and bather load, with multiport valves for backwashing.
06Pump room
Plant room fit-out with concrete plinths, organised manifolds and supported pipe runs for easy operation and maintenance.
07Electrical & lighting
Control panels, earthing, programmable underwater LED lighting and surrounding architectural lighting.
08Heating
Heat pumps or heat exchangers where required, with temperature control for seasonal use.
09Treatment & dosing
Automatic chlorine and pH dosing controllers or salt chlorination, depending on the project.
10Finishing
Glass mosaic, lane tiles and guide lines, coping stones, and slip-resistant surrounding decks.
11Testing & commissioning
Pressure-testing of pipework, fill testing, trial running of pumps, filters and lighting, and water-chemistry balancing.
12Maintenance
Handover with operator training and a scheduled maintenance programme for water quality and equipment efficiency.
Two clear phases
Construction, then finishing
What is built and covered comes first, then what is seen and used. Each phase has its own crew and checks.
Construction phase
- Site survey, setting-out and levels
- Excavation, compaction and blinding concrete
- Slab and wall reinforcement with embedded pipework
- Timber formwork and pump-cast concrete
- Waterproofing and fill testing
- Returns, suctions, light niches and hydromassage loungers set in place
Finishing phase
- Mosaic, tiles and lane markings
- Coping and surrounding decks
- Underwater lighting and water jets commissioned
- Filters, pumps and water chemistry balanced
- Final cleaning and filling
- Testing and handover with training
Equipment & systems
How the system works
Circulation loop
Water is drawn through skimmers and main drains, passes the sand filter, heater and treatment unit, and returns through inlets distributed around the basin.
Control & treatment
A control panel for pumps, lighting and heating, and a dosing unit that measures and corrects chlorine and pH automatically.
Lighting
Underwater LED fixtures with safety transformers and earthing, programmable with colour scenes.
Applications
Where we deliver it
- Private villas and palaces
- Rest houses (istirahat)
- Clubs and sports facilities
- Hotels and resorts
- Residential compounds
- Government and institutional facilities
Advantages
Why WORLD POOL
One accountable team
The team that excavates is the team that lays the mosaic and starts the pumps; responsibility never falls between contractors.
Watertight from the start
The basin is fill-tested before finishing, so any defect appears before it is covered.
Quiet operation
An organised plant room and pumps sized to the actual pool.
Finishes that last
Chlorine-resistant materials, considered edges and correct drainage details.
Workflow
From survey to handover
The same sequence on every project, with a check before moving from one phase to the next. All 13 stages in detail
- Survey & studySite visit, measurement and understanding how the space will be used.
- Design & drawingsConcept, shop drawings and a materials and equipment schedule.
- ConstructionStructure, waterproofing and buried services.
- Systems & equipmentEquipment, MEP connections and control panels.
- FinishingVisible materials, lighting and detailing.
- Testing & handoverTrial run, adjustment, training and handover.
Photo studio
Swimming Pools gallery
46 photos. Open any image for the full view with its stage description.
No images in this category.
Technical details
Questions clients ask
What is the difference between construction and finishing?
Construction covers everything that is buried or covered: structure, reinforcement, waterproofing and pipework. Finishing covers what you see and use: mosaic, coping, lighting and commissioning.
When is the fill test done?
After the concrete shell and waterproofing are complete and before mosaic work, so any leak is found before the finish goes on.
Can hydromassage loungers be added?
Yes. Loungers and seats are set and plumbed during construction, then clad in mosaic with the rest of the basin.
Related services
Works well with

Have a space? We can show you what it could become.
Book a site visit and initial consultation. We will come back with a preliminary concept and a clear estimate of cost and time.